What should be paid attention when a composite decking platform built?
-----------------------------------------------------------------------------------------------------------------------------------------------------------
1. Prevent moisture accumulation
Platforms which Low exposed should be built on the dry ground and firmly supported. If the ground is too wet, a drainage mat or sewer system should be provided.
2. Enough thickness
The outdoor platform is different from the standard floor, it will undertake all the loading. Therefore, to make sure the platform is thick enough to withstand the expected loading.The thickness of the platform decking should be at least 25mm.